… team GWK solve a big problem…

… and, on a very hot day in June, demonstrate to the assembled team an ingenious way of shifting the mash blocks off the wooden pallets with minimal pressure exerted on the soil block – this way, blocks should be able to stay as undisturbed as possible, and with minimal zones of weakness between them, when they are moved into the flume for assembly of the saltmarsh in late September…

june_pic2

With one more look at the impressively long, now water-filled, tank, the team leave Hannover, more convinced than before, that this all might just work….

june_pic3

This entry was posted in Uncategorized. Bookmark the permalink.